Kitchen Remodels
Open layouts, custom cabinetry, and the lighting plan that pulls it all together.
The kitchen is where the day starts and where it ends. A great kitchen remodel is not about a Pinterest board. It is about the way you actually cook, host, and live in the room. ORO designs and builds DFW kitchens around how the space will be used, not just how it will photograph.
From a single-room refresh to a full open-concept rework, our designers and project managers work as one team. You see 3D renderings before construction starts, finish samples in hand, and a clear written budget. The kitchen we build is the kitchen you approved.
What You Get When You Hire ORO for Kitchen Remodels
How a Kitchen Remodels Project Runs
-
1
Consultation
Walk through the space, talk goals, take measurements.
-
2
Design + Selections
Plans, finishes, fixtures, and a preliminary budget.
-
3
Pre-Construction
Permits, full drawings, materials ordered, schedule locked.
-
4
Build
Demolition through finish work, weekly progress reviews.
-
5
Punch List + Handoff
Final walkthrough, sign-off, and your warranty in writing.
Common Questions
How long does a kitchen remodel take?
Most ORO kitchen remodels take 8 to 14 weeks from demolition to final walkthrough. Layout-only refreshes can be shorter. Remodels that involve moving plumbing, structural changes, or custom cabinetry on a long lead are longer. You get a written schedule before we start.
How much does a kitchen remodel cost in DFW?
Costs vary widely based on scope, finishes, and structural work. Mid-range refreshes typically start in the $40,000 range. Larger open-concept reworks with custom cabinetry, premium counters, and high-end appliances run substantially higher. After the design phase you get a detailed line-item estimate.
Do I need to move out during a kitchen remodel?
Not usually. We set up dust containment and a temporary kitchen area where possible. Some clients choose to step out during the messiest demolition days. We can plan around your schedule.
Can you work with my existing layout, or do I need to start over?
Both work. If your layout is solid, a finish and cabinetry refresh is the most cost-effective path. If you want to open up the kitchen to the living area, change traffic flow, or add an island, we can rework the floor plan during design.