Commercial Construction

Restaurants, retail, office, healthcare, and multifamily buildouts, finished on schedule so you can open on time.

Commercial construction is a different kind of project: every day past your scheduled opening is a day you are not making money. ORO runs commercial buildouts as turnkey jobs, design, demolition, MEP, finishes, FF&E coordination, and the certificate of occupancy, with the schedule discipline tenants and franchisees actually need.

We have built restaurants (Tazikis, Coolgreens), retail (GNC), and healthcare (ReBalance Physical Therapy), as well as office and multifamily projects across DFW. Every project gets a dedicated project manager, a published schedule, and weekly progress reviews.

What's Included

What You Get When You Hire ORO for Commercial Construction

Turnkey buildouts from demo through punch list, with one point of accountability.
Restaurant and food-service construction: hood and grease-trap coordination, FRP, equipment install, health-department coordination.
Retail and franchise buildouts with brand-spec compliance, fixturing, and signage coordination.
Healthcare and medical office with ADA, HIPAA-aware layouts, medical gas where required, infection-control planning.
Office tenant improvements: demising walls, conference rooms, AV/networking, flexible workspace layouts.
Multifamily and mixed-use: unit interiors, common areas, amenity buildouts.
Pre-construction services: site evaluation, feasibility, cost estimating, schedule, contractor selection.
Permitting, ADA, and green-building consulting included.
Process

How a Commercial Construction Project Runs

  1. 1

    Site Evaluation

    Walk the space, evaluate as-built conditions, identify what we can keep and what has to come out.

  2. 2

    Pre-Construction

    Feasibility, scope, schedule, budget, and permit strategy. The plan you can build a business around.

  3. 3

    Design + Permits

    Construction documents, MEP coordination, brand or franchise specs, city + ADA review.

  4. 4

    Build

    Demolition through finish, weekly progress meetings, photo updates, change-order discipline.

  5. 5

    Open

    Final inspections, certificate of occupancy, FF&E install, hand-off ready for opening day.

FAQ

Common Questions

How fast can you turn around a buildout?

It depends on the space and the scope. A simple retail refresh might be 6 to 10 weeks. A full restaurant buildout is typically 14 to 22 weeks. Large office or healthcare projects are longer. We commit to a schedule during pre-construction, not based on a wishlist.

Do you handle franchise and brand specs?

Yes. We have built to franchise and corporate brand specs across food service, retail, and healthcare. We work directly with brand construction managers and architects to keep the project in spec without surprises.

Can you help with site selection or lease evaluation?

Yes. As a pre-construction service we walk candidate sites, evaluate what each would cost to fit out, and flag risks (roof condition, MEP capacity, ADA gaps, hidden code requirements). Many tenants find this saves them from picking the wrong space.

Do you do ADA compliance work?

Yes, both new construction and remediation of existing spaces. We can also coordinate green-building and sustainability planning where relevant.